Chemical and process plant commissioning handbook : (Record no. 179)

MARC details
000 -LEADER
fixed length control field 01869cam a22003857a 4500
001 - CONTROL NUMBER
control field 17151815
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220308161325.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 120207s2012 ne a f 001 0 eng d
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2011276748
015 ## - NATIONAL BIBLIOGRAPHY NUMBER
National bibliography number GBB167903
Source bnb
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780080971742 (hbk.)
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 0080971741 (hbk.)
035 ## - SYSTEM CONTROL NUMBER
System control number (OCoLC)ocn759570702
040 ## - CATALOGING SOURCE
Original cataloging agency LCC
Transcribing agency GSU
Modifying agency GSU
Description conventions rda
Language of cataloging English
042 ## - AUTHENTICATION CODE
Authentication code lccopycat
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TP155.5
Item number KIL
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 660.28073
Edition number KIL
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Killcross, Martin.
Relator term Aurthor
245 10 - TITLE STATEMENT
Title Chemical and process plant commissioning handbook :
Remainder of title a practical guide to plant system and equipment installation and commissioning /
Statement of responsibility, etc. Martin Killcross.
250 ## - EDITION STATEMENT
Edition statement 1st ed.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Amsterdam ;
-- Boston :
Name of publisher, distributor, etc. Elsevier/Butterworth-Heinemann,
Date of publication, distribution, etc. 2012.
300 ## - PHYSICAL DESCRIPTION
Extent xxv, 285 p. :
Other physical details illustration black and white
Dimensions 25 cm.
500 ## - GENERAL NOTE
General note Includes index.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Commissioning phase one- prepare,Commissioning phase two - implement, Commissioning phase three - close -out
520 ## - SUMMARY, ETC.
Summary, etc. "A guide and reference to preparing a systematic methodology for converting a newly constructed plant, as well as streamlining equipment into an operational process unit. [...] The reference focuses on the critical safety assessment and inspection regimes necessary to ensure that new plants are compliant with OSH (A) and environmental requirements"--P. [4] of cover.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Building commissioning
Form subdivision Handbooks, manuals, etc.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Chemical plants
General subdivision Design and construction
-- Standards.
651 ## - SUBJECT ADDED ENTRY--GEOGRAPHIC NAME
Source of heading or term Chemical and Process Plant Commisioning Handbook
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name EngTech TIChemE
Relator term Author
906 ## - LOCAL DATA ELEMENT F, LDF (RLIN)
a 7
b cbc
c copycat
d 2
e ncip
f 20
g y-gencatlg
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Books
Suppress in OPAC No
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Inventory number Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Library of Congress Classification     GSU Library Epoch GSU Library Epoch General Stacks 08/03/2022 BAI 00584   TP159KIL 50000003674 08/03/2022 2012 08/03/2022 Books