000 | 01869cam a22003857a 4500 | ||
---|---|---|---|
001 | 17151815 | ||
003 | OSt | ||
005 | 20220308161325.0 | ||
008 | 120207s2012 ne a f 001 0 eng d | ||
010 | _a 2011276748 | ||
015 |
_aGBB167903 _2bnb |
||
020 | _a9780080971742 (hbk.) | ||
020 | _a0080971741 (hbk.) | ||
035 | _a(OCoLC)ocn759570702 | ||
040 |
_aLCC _cGSU _dGSU _erda _bEnglish |
||
042 | _alccopycat | ||
050 | 0 | 0 |
_aTP155.5 _bKIL |
082 | 0 | 4 |
_a660.28073 _2KIL |
100 | 1 |
_aKillcross, Martin. _eAurthor |
|
245 | 1 | 0 |
_aChemical and process plant commissioning handbook : _ba practical guide to plant system and equipment installation and commissioning / _cMartin Killcross. |
250 | _a1st ed. | ||
260 |
_aAmsterdam ; _aBoston : _bElsevier/Butterworth-Heinemann, _c2012. |
||
300 |
_axxv, 285 p. : _billustration black and white _c25 cm. |
||
500 | _aIncludes index. | ||
505 | _aCommissioning phase one- prepare,Commissioning phase two - implement, Commissioning phase three - close -out | ||
520 | _a"A guide and reference to preparing a systematic methodology for converting a newly constructed plant, as well as streamlining equipment into an operational process unit. [...] The reference focuses on the critical safety assessment and inspection regimes necessary to ensure that new plants are compliant with OSH (A) and environmental requirements"--P. [4] of cover. | ||
650 | 0 |
_aBuilding commissioning _vHandbooks, manuals, etc. |
|
650 | 0 |
_aChemical plants _xDesign and construction _xStandards. |
|
651 | _2Chemical and Process Plant Commisioning Handbook | ||
700 |
_aEngTech TIChemE _eAuthor |
||
906 |
_a7 _bcbc _ccopycat _d2 _encip _f20 _gy-gencatlg |
||
942 |
_2lcc _cBK _n0 |
||
999 |
_c179 _d179 |